Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


When two or more systems are integrated, input/output
controls must be reviewed by the IS auditor in the:

A. systems receiving the output of other systems.

B. systems sending output to other systems.

C. systems sending and receiving data.

D. interfaces between the two systems.



When two or more systems are integrated, input/output controls must be reviewed by the IS auditor i..

Answer / guest

Answer: C

Both of the systems must be reviewed for input/output
controls since the output for one system is the input for
the other.

Is This Answer Correct ?    5 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

Which of the following audit procedures would an IS auditor normally perform FIRST when reviewing an organization's systems development methodology? A. Determine procedural adequacy. B. Analyze procedural effectiveness. C. Evaluate level of compliance with procedures. D. Compare established standards to observed procedures.

1 Answers  


An IS auditor performing a telecommunication access control review should be concerned PRIMARILY with the: A. maintenance of access logs of usage of various system resources. B. authorization and authentication of the user prior to granting access to system resources. C. adequate protection of stored data on servers by encryption or other means. D. accountability system and the ability to identify any terminal accessing system resources.

1 Answers   CISA,


An IS auditor should be able to identify and evaluate various types of risks and their potential effects. Which of the following risks is associated with authorized program exits (trap doors)? A. Inherent B. Detection C. Audit D. Error

2 Answers  


Which of the following would be the LEAST important aspect of a business continuity plan? A. Redundant facilities B. Relocation procedures C. Adequate insurance coverage D. Current and available business continuity manual

1 Answers  


Which of the following would be a compensating control to mitigate risks resulting from an inadequate segregation of duties? A. Sequence check B. Check digit C. Source documentation retention D. Batch control reconciliations

1 Answers  


Which of the following is a control over component communication failure/errors? A. Restricting operator access and maintaining audit trails B. Monitoring and reviewing system engineering activity C. Providing network redundancy D. Establishing physical barriers to the data transmitted over the network

1 Answers  


Which of the following is the MOST critical and contributes the MOST to the quality of data in a data warehouse? A. Accuracy of the source data B. Credibility of the data source C. Accuracy of the extraction process D. Accuracy of the data transformation

1 Answers  


Which of the following applet intrusion issues poses the GREATEST risk of disruption to an organization? A. A program that deposits a virus on a client machine B. Applets recording keystrokes and, therefore, passwords C. Downloaded code that reads files on a client's hard drive D. Applets opening connections from the client machine

1 Answers  


Which of the following findings would an IS auditor be MOST concerned about when performing an audit of backup and recovery and the offsite storage vault? A. There are three individuals with a key to enter the area. B. Paper documents also are stored in the offsite vault. C. Data files, which are stored in the vault, are synchronized. D. The offsite vault is located in a separate facility.

1 Answers   Apple,


Which of the following is the MOST important issue to the IS auditor in a business process re-engineering (BPR) project would be? A. The loss of middle management, which often is a result of a BPR project B. That controls are usually given low priority in a BPR project C. The considerable negative impact that information protection could have on BPR D. The risk of failure due to the large size of the task usually undertaken in a BPR project

2 Answers  


Which of the following is a measure of the size of an information system based on the number and complexity of a system?s inputs, outputs and files? A. Function point (FP) B. Program evaluation review technique (PERT) C. Rapid application design (RAD) D. Critical path method (CPM)

2 Answers  


Which of the following exposures associated with the spooling of sensitive reports for offline printing would an IS auditor consider to be the MOST serious? A. Sensitive data can be read by operators. B. Data can be amended without authorization. C. Unauthorized report copies can be printed. D. Output can be lost in the event of system failure.

2 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)