Reconfiguring which of the following firewall types will
prevent inward downloading of files through the file
transfer protocol (FTP)?
A. Circuit gateway
B. Application gateway
C. Packet filter
D. Screening router
Answer / guest
Answer: B
An application gateway firewall is effective in preventing
applications, such as FTPs, from entering the organization
network. A circuit gateway firewall is able to prevent paths
or circuits, not applications, from entering the
organization network. A packet filter firewall or screening
router will allow or prevent access based on IP packets/address.
| Is This Answer Correct ? | 9 Yes | 2 No |
Which of the following is a network architecture configuration that links each station directly to a main hub? A. Bus B. Ring C. Star D. Completed connected
Utilizing audit software to compare the object code of two programs is an audit technique used to test program: A. logic. B. changes. C. efficiency. D. computations.
Which of the following would be a compensating control to mitigate risks resulting from an inadequate segregation of duties? A. Sequence check B. Check digit C. Source documentation retention D. Batch control reconciliations
In which of the following phases of the system development life cycle (SDLC) is it the MOST important for the IS auditor to participate? A. Design B. Testing C. Programming D. Implementation
Which of the following exposures associated with the spooling of sensitive reports for offline printing would an IS auditor consider to be the MOST serious? A. Sensitive data can be read by operators. B. Data can be amended without authorization. C. Unauthorized report copies can be printed. D. Output can be lost in the event of system failure.
Which of the following data entry controls provides the GREATEST assurance that the data is entered correctly? A. Using key verification B. Segregating the data entry function from data entry verification C. Maintaining a log/record detailing the time, date, employee's initials/user id and progress of various data preparation and verification tasks D. Adding check digits
While reviewing an ongoing project, the IS auditor notes that the development team has spent eight hours of activity on the first day against a budget of 24 hours (over three days). The projected time to complete the remainder of the activity is 20 hours. The IS auditor should report that the project: A. is behind schedule. B. is ahead of schedule. C. is on schedule. D. cannot be evaluated until the activity is completed.
Which of the following is the MOST critical element of an effective disaster recovery plan (DRP)? A. Offsite storage of backup data B. Up-to-date list of key disaster recovery contacts C. Availability of a replacement data center D. Clearly defined recovery time objective (RTO)
An IS auditor is reviewing the change management process for an enterprise resource planning (ERP) application. Which of the following is the BEST method for testing program changes? A. Select a sample of change tickets and review them for authorization. B. Perform a walk-through by tracing a program change from start to finish. C. Trace a sample of modified programs to supporting change tickets. D. Use query software to analyze all change tickets for missing fields.
During the course of an audit, the IS auditor discovers that the human resources (HR) department uses a cloud-based application to manage employee records. The HR department engaged in a contract outside of the normal vendor management process and manages the application on its own. Which of the following choices is of MOST concern? A. Maximum acceptable downtime metrics have not been defined in the contract. B. The IT department does not manage the relationship with the cloud vendor. C. The help desk call center is in a different country, with different privacy requirements. D. Company-defined security policies are not applied to the cloud application.
When developing a risk-based audit strategy, an IS auditor should conduct a risk assessment to ensure that:
IS auditors are MOST likely to perform compliance tests of internal controls if, after their initial evaluation of the controls, they conclude that: A. a substantive test would be too costly. B. the control environment is poor. C. inherent risk is low. D. control risks are within the acceptable limits.