When auditing security for a data center, an IS auditor
should look for the presence of a voltage regulator to
ensure that the:

A. hardware is protected against power surges.

B. integrity is maintained if the main power is interrupted.

C. immediate power will be available if the main power is lost.

D. hardware is protected against long-term power fluctuations.

Answers were Sorted based on User's Feedback



When auditing security for a data center, an IS auditor should look for the presence of a voltage r..

Answer / guest

Answer: A

A voltage regulator protects against short-term power
fluctuations. It normally does not protect against long-term
surges, nor does it maintain the integrity if power is
interrupted or lost.

Is This Answer Correct ?    4 Yes 0 No

When auditing security for a data center, an IS auditor should look for the presence of a voltage r..

Answer / shanka

Answer A:

A. is about regulator
B. is about UPS (unbreakable power supply) or voltage Stabilizer.
C. is about UPS or a generator
D. regulator cant handle long term power fluctuations.

because of these points A is the answer.

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

Which of the following BEST describes the role of a systems analyst? A. Defines corporate databases B. Designs systems based on the needs of the user C. Schedules computer resources D. Tests and evaluates programmer and optimization tools

1 Answers  


The management of an organization has decided to establish a security awareness program. Which of the following would MOST likely be a part of the program? A. Utilization of an intrusion detection system to report incidents. B. Mandating the use of passwords to access all software. C. Installing an efficient user log system to track the actions of each user D. Provide training on a regular basis to all current and new employees.

1 Answers  


One of the purposes of library control software is to allow: A. programmers access to production source and object libraries. B. batch program updating. C. operators to update the control library with the production version before testing is completed. D. read-only access to source code.

2 Answers  


52. Which of the following tests confirm that the new system can operate in its target environment?

1 Answers  


Which of the following concerns associated with the World Wide Web would be addressed by a firewall? A. Unauthorized access from outside the organization B. Unauthorized access from within the organization C. A delay in Internet connectivity D. A delay in downloading using file transfer protocol (FTP)

2 Answers  






When reviewing a system development project an IS auditor would be PRIMARILY concerned with whether: A. business objectives are achieved. B. security and control procedures are adequate. C. the system utilizes the strategic technical infrastructure. D. development will comply with the approved quality management processes

1 Answers  


Which of the following can consume valuable network bandwidth? A. Trojan horses B. Trap doors C. Worms D. Vaccines

1 Answers  


While reviewing an ongoing project, the IS auditor notes that the development team has spent eight hours of activity on the first day against a budget of 24 hours (over three days). The projected time to complete the remainder of the activity is 20 hours. The IS auditor should report that the project: A. is behind schedule. B. is ahead of schedule. C. is on schedule. D. cannot be evaluated until the activity is completed.

1 Answers  


Sales orders are automatically numbered sequentially at each of a retailer's multiple outlets. Small orders are processed directly at the outlets, with large orders sent to a central production facility. The MOST appropriate control to ensure that all orders transmitted to production are received and processed would be to: A. send and reconcile transaction counts and totals. B. have data transmitted back to the local site for comparison. C. compare data communications protocols with parity checking. D. track and account for the numerical sequence of sales orders at the production facility.

1 Answers  


Which of the following would be considered an essential feature of a network management system? A. A graphical interface to map the network topology B. Capacity to interact with the Internet to solve the problems C. Connectivity to a help desk for advice on difficult issues D. An export facility for piping data to spreadsheets

1 Answers  


Testing the connection of two or more system components that pass information from one area to another is: A. pilot testing. B. parallel testing C. interface testing. D. regression testing.

2 Answers  


In a TCP/IP-based network, an IP address specifies a: A. network connection. B. router/gateway. C. computer in the network. D. device on the network.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)