Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How can we step up ac and dc ?



How can we step up ac and dc ?..

Answer / raju

AC can be step up from Step Up Transformer. And DC by using
Choper

Is This Answer Correct ?    7 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

Acually generator neutral is earthed,if suppose cable from neutral is brokened under theearth ,what will happen.

2 Answers   L&T,


how to calculate power

3 Answers  


Tell me about Simence PLC 'BLOCK'.How many types and what for.

1 Answers   Gurit,


how to operate and maintenance of 1500 kva diesel generator set

0 Answers   Supertech,


we have two motors 1250kW,6.6kV to be coupled on the same shaft ,so please provide assistance for their synchronisation.

0 Answers  


Anybody now how to claculate the Bescom power consumption?

1 Answers  


What can make the the overloads operate when a star delta three phase motor starts?

1 Answers  


I have a question, I visit 01 site and face a problem, there is 2.5 ton Air Con working, when air con compressor is running at that time rectifier voltages are increasing upto 290-295 v and rectifier is giving main high alarm (rectifier is APC single phase, before starting compressor rectifier voltages was 230v. when air con is going off rectifier voltages are decreasing smoothly at its actual voltages 230v. Load on Genset phases is this: Red-13.5 amp AC (Air Con load), Yellow-1.7 amp AC (BTS lights etc.) and Blew-4 amp AC (telecom system load), Genset phase to phase and neutral to phase voltages are also ok. These are 10 sites having same system and same rectifier APC brand at every site 02 genset are working but the problem is same at all these 10 sites. What will be the reason behind???

1 Answers  


explain about RTCC

2 Answers   HAL,


why mosquito bat makes noise when it hits with a insect?

2 Answers  


why is the rating of transformer done in kva and not in kw.

21 Answers   Honeywell, Satyam,


what is the difference between current rating and breaking current of an MCCB? and for a known load how to calculate the current rating of a MCCB?

1 Answers   HPL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)