a decorator bought a bolt of d m number of red chips in any
one stack€?

Answers were Sorted based on User's Feedback



a decorator bought a bolt of d m number of red chips in any one stack€?..

Answer / raj

5

Is This Answer Correct ?    58 Yes 13 No

a decorator bought a bolt of d m number of red chips in any one stack€?..

Answer / jahnavi

5

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More General Aptitude Interview Questions

Modulo(373,7)+round(5.8)+truncat(7.2)-round(3.4)=

6 Answers   TCS,


if the radius of the circle is increased by 6% then its area increased by

0 Answers   DSQ Software,


The day before yesterday was WEDNESDAY then the day after tomorrow is?

0 Answers   Amdocs,


a student got 70% in one subject,80% in other.to get overall 75% how much he should get in third subject

10 Answers   Cognizant, Patni,


a sum 's' is devided into 4 parts.second person gets Rs 10 more than first.3rd person is Rs 10 more than second, 4th is 10 more than 3rd. how much amount do 1st person get.

14 Answers   ICICI, Wipro,






5 thieves stole diamonds in following way 1st stole half +2 2nd remaining half +2. for 5th there was no diamond how many diamond were there initially

0 Answers   Infosys,


In a colony there are some families. Each of them have children but different in numbers.Following are conditions a> no of adult>no of sons>no of daughters>no of families. b>each sister must have atleast one brother and should have at the most 1 sister. c> no of children in one family exceeds the sum of no of children in the rest families Tell the no of families

1 Answers   Cognizant,


A 2D array is declared as A[9,7] and each element requires 2 byte.If A[ 1,1 ] is stored in 3000. Find the memory of A[8,5] ?

0 Answers   Accenture, BSNL,


If A can complete a work in 6 hours, and B can complete it in 8 hours, then how much time would they take to complete the work together?

5 Answers   Wipro,


A team of 200 wagers undertakes building work of a bridge. The total time allocated to build the entire bridge is 20 days. After 10 days since start, 200 more wagers join the team and together the team completes the bridge in required time. If the original team do not get those 200 extra wagers, how many days they would be behind schedule to complete building the bridge.

0 Answers   Wipro,


How many liters of water must be added to 30 liters of alcohol to make a solution that is 25%

0 Answers   DSQ Software,


) Six friends decide to share a big cake. Since all of them like the cake, they begin quarreling who gets to first cut and have a piece of the cake. One friend suggests that they have a blindfold friend choose from well shuffled set of cards numbered one to six. You check and find that this method works as it should simulating a fair throw of a die. You check by performing multiple simultaneous trials of picking the cards blindfold and throwing a die. You note that the number shown by the method of picking up a card and throwing a real world die, sums to a number between 2 and 12. Which total would be likely to appear more often – 8,9 or 10?

1 Answers   TCS,


Categories