list of tests to be carried out at manufacturers end while purchasing a step up transformer of 11kv to 66kv ,2MVa Capacity.
No Answer is Posted For this Question
Be the First to Post Answer
Describe the control mechanism of missile launcher???
why we calculate only 11kv 33kv and 132kv ... why not 10kv 20kv 45kv?
what is the sweep commenly used 1200mm sweep and 600mmsweep please tell me breifly sweep
Explain working of PIU(Power Interface Unit) in Telecommunication,
7 Answers ACME, ATC, Bharti, HCL, INDUS, Pace Pharmaceuticals,
What is the deffirant between EARTH, GROUND AND NUTRAL
What is Delta Connection? What is meant by Forward Delta & Reverse Delta & How Will be the Connection in Power Transformers?
sir i am ece engineer.i want to job in power plant.what is the best option for me as electrical engineer or instrumentation engineer?pls reply me.
Is it true that in the 3 phase transformer, the limbs of the core are at 45 dgrees to each other. if true, why?
different between electrical and electronics Engineering????
how to enter inverter parameter? without manaual?
why do the alternator doesnt have open circuited windings in armature???
why transformer rating comes in kva?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)