rate analysis hiring of generator 62.5 KVA
No Answer is Posted For this Question
Be the First to Post Answer
we do not provide reinforcement bar through the centre of a column.why?
IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE METHOD IS BEST? I THINK WORKING STRESS METHOD IS BEST? EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST IS;1913SQ.MM SAME TIME WORKING STRESS METHOD IS ;2213. SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE THEN LIMIT STATE METHOD? MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS
How do you calculate reinforcement weight of steel?
How much steel required in 1 square feet slab?
how much cubic feet cement contain in one bag
If we know the N - Value of soil and required bearing capacity how do we know what diameter and length of pile to be casted? How can we check whether the dia. and lenght of pile we have selected are most economical onse?
what is mean by super structure?
is plate load test can be done on cohesive soils for immediate settlements ?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
How do you calculate the unit weight of concrete?
what is 43 & 53 in cement
to minimize budget cost of building , what can i do
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)