Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Why all the drains(Gland sealing,ESV,Casing inlet etc) are
directly connected to the flash tank instead of hotwell of
the condensor in the power plant?
My Email Id:naba02222@gmail.com


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Instrumentation Interview Questions

hello can yoy pls send me previous papers of jindalpower and steel ltd.....'m from instrumentation..... mani1048@gmail.com

0 Answers  


in a power plant main steam flow is volumetric or mass flow? is it required compensation?

1 Answers   Wartsila,


Identify and use the ANSI/ISA-S5.1 consensus industrial standard process symbols.

0 Answers   GAIL, Olympia,


What is controller? What is transmitter?

1 Answers  


Isometric drawings are generated during _________________ phase of a project

0 Answers  


Related to control system, What is difference between 4-20 mA active & 4-20 mA pasive signal.

1 Answers  


How u will setup SPI(2007) on Citrix Server (Thin Client Mode)? Plz Justify?

0 Answers  


What is mean by trim?

5 Answers  


Why Pressure Transmitter is NOT installed before up-stream of an ORIFICE PLATE? in a flow measurement.

4 Answers   Mecon,


Which types of quections asked in interview for FORMULATION PLANT (PHARMA)

0 Answers  


what is difference between total flow and flow rate in general ?? explain it with daily life example.

3 Answers   GNFC,


Sitrans LR460 Radar level transmitter getting level out or disturbed level during moisture present in the material ie coal in the pccb bunker in CHP.Any suggestions for this problem...????

1 Answers   ABG Shipyard,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)