why rotameter has variable area?? is it necessary??
Answer / ravi
it measure flow rate of a liquid or gas by relating linear
displacement of an internal "float" or sharp-edged orifice
plate (Lake Monitor) to a corresponding flow rate.
Is This Answer Correct ? | 22 Yes | 7 No |
CHEMICAL ENERGY BALANCE - EXAMPLE 11.4 : Calculate the bubble temperature T at P = 85-kPa for a binary liquid with x(1) = 0.4. The liquid solution is ideal. The saturation pressures are Psat(1) = exp [ 14.3 - 2945 / (T + 224) ], Psat(2) = exp [ 14.2 - 2943 / (T + 209) ] where T is in degree Celsius. Please take note that x(1) + x(2) = 1. Please take note that y(1) + y(2) = 1, y(1) = [ x(1) * Psat(1) ] / P, y(2) = [ x(2) * Psat(2) ] / P, * is multiplication. P is in kPa.
why PH scale range is 14? why it is not less or not greater than 14? solution of HCl or hydrogen containing liquid has a PH. but if the solution is KMnO4 here not hydrogen power does it PH? explain plz....
QUANTUM CHEMISTRY AND CHEMICAL ENGINEERING - EXAMPLE 31.9 : When an algebraic product is defined on the space, the Lie bracket is the commutator [x,y] = xy - yx according to Lie algebra in mathematics. If [p,x] f(x) = px f(x) - xp f(x), p = -ih d / dx, find the value of [p,x] in term of i and h.
Explain what are the methods involved to test helium leak testing in a vacuum system?
what is the speed of a rotary drier
The job profile as a Service Engineer?
hi.i m student of chemical engg. and studying in 5 th sem.how can i improve my technical knowledge..can u sugest me a link like book or any website..?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.24 : (a) The net present value of an engineering project is given by V. Let Q = summation of [ T / (1 + I) ^ N ] from N = A to N = B, where P = project cost, T = tax inflow, N = duration. If V = P + Q where P = -$1000, T = $275, I = 0.12 (means 12 % , capital cost of project per year), A = 1 year, B = 5 years, calculate the value of V. (b) The present value tax shields are W = $ (11.9725, 9.1486, 6.5579, 4.1811, 2.0005) in 5 beginning balances of an engineering project. Find the adjusted present value of the engineering project X, when X = V + (summation of the values of W).
QUANTUM COMPUTING - EXAMPLE 32.3 : A system of linear congruences consists of 3 equations : X ≡ 1 (mod 3), X ≡ 3 (mod 5), X ≡ 4 (mod 6). X has positive values. (a) List the values of these equations from 1 to 35. Then find the minimum value of X. (b)(i) Find the least common multiple (LCM) of b = 3, 5 and 6 where X ≡ a (mod b). (ii) If b - a has the same value of all equations above, then X + (b - a) is divisible by LCM. Find the value of minimum value of X via LCM division.
What type of heat exchangers are most commonly used for a large-scale plant-cooling loop using seawater as the utility?
what is the difference between distillation column and distillation tower?
distance education chemical engineer degree aprooved courses any?