A 100KVA SINGLE PHASE TRANSFORMER 10000/200V,50HZ REQUIRES
300V AT HV SIDE TO CIRCULATE FULL LOAD CURRENT WITH LV SHORT
CIRCUITED.THE INTAKE IS 1000W.THE % OF REGULATION ON FULL
LOAD AT 0.8 PF LAGGING WILL BE HOW MUCH AND THE SECONDARY
TERMINAL VOLTAGE ON 0.8 PF LEADING WILL BE
No Answer is Posted For this Question
Be the First to Post Answer
WHAT IS THE WINDING PROCEDURE OF ELECTRICAL MOTOR
how to calculate the lightning arrester conductor @ no of earth pits required
can anybody sent me power grid questions. what subject should i prefer for preparation?
1. what is the meaning of bus? 2. what is the dc transformer? How it work 3.what is the function of the serge absorber? 4.How the CT and PT rating calculate/
how can a transformer test by megger?
Can neutral line also be use as a earthting for distribution transformer, or we need separate earthing pit forh the transformer?
What are the criteria shall be considers for sizing Fuse and MCB? If the rated current is 10Amps what should be the fuse size / MCB Size?
what is stepping motor and where can use in electrical installation.
what is the function of choke in a tubelight
In wat way the power compensation takes place when a statcom is connected in a transmission line
Which motor has high starting torque
what is the meaning of neutral displacement ???
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)