Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


A 100KVA SINGLE PHASE TRANSFORMER 10000/200V,50HZ REQUIRES
300V AT HV SIDE TO CIRCULATE FULL LOAD CURRENT WITH LV SHORT
CIRCUITED.THE INTAKE IS 1000W.THE % OF REGULATION ON FULL
LOAD AT 0.8 PF LAGGING WILL BE HOW MUCH AND THE SECONDARY
TERMINAL VOLTAGE ON 0.8 PF LEADING WILL BE


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Electrical Engineering Interview Questions

what is 'A' Check & 'B' Check ?

2 Answers  


how to find 5 kilo meter long under ground 33 kv cable fault location if IR VALUE shows 0.05 M ohm @5000 volt.and cable fault locator shows some time fault distance 3 kilo meter ,3.7 kilo meter and some time 1 kilo meter? now how to find the fault location that where is leakage. note--it is tested with 5000 kv megger and insulation resistance is 0.05 M ohm. and some time 0.03 M ohm comes.

0 Answers   OPS,


WHEN TWO ALTERNATORS ARE OPERATING IN PARALLEL, EXPLAIN WHY IT IS OBJECTIONABLE TO OPERATE ONE AT A LEADING POWER FACTOR AND ONE AT THE Lagging power factor?

1 Answers  


what is the use of earthing?

1 Answers   CPCL,


what is the different types of cable lugs?

2 Answers   Green Power, Kum Yang,


How you take care of a motor from over loading and what are the different overloading ratings of different motors?

4 Answers  


i want to know about psu exam eligibility critaria?

1 Answers   ISRO, PSU,


Can a dc motor works as a dc generator. If yes , then how?

2 Answers  


what is pulverisation

2 Answers  


If we tell 60 sq.mm. 3-1/2 core cable,then what does it mean ? 1) Each core section in the whole cable is of 60 sq. mm. 2) The whole cable is of 60 sq. mm. which is sub-divided into 3-1/2 core.

3 Answers   Cura HealthCare,


how can i improve the power factor in domestic (230v)

0 Answers   Epcos,


how to calculate current in HT side when we having LT current

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)