enterprise datawarehouse your project phase by phase
explain?
Answer / siva
Its depend on the project scheduling..
In some projects.. it will considered as
ph1 -- Requirements Gathering
ph2 -- Analysis and framework
ph3 -- Designing
ph4 -- Production Migration, performance tuning and
maintenance activities
In other hand some projects will be set as
ph1 -- Integrating the sources
ph2 -- Creating the Datamarts and Aggregations
ph3 -- Reporting
So its depends on size and requirements of the project
Hope you got it..
| Is This Answer Correct ? | 8 Yes | 0 No |
What is joiner change?
While importing the relational source definition from the database, what are the metadata of source that will be imported?
There are 100 lines in a file. How to print line number 31-50 and 81-90 in unix with a single command.
If the source has duplicate records as id and name columns, values: 1 a, 1 b, 1 c, 2 a, 2 b,the target shd be loaded as 1 a+b+c or 1 a||b||c, what transformations shd be used for this?
What are variable ports and list two situations when they can be used?
What are the limitations of joiner transformation?
how we load the data from source to staging area
How do you implement scheduling in Informatica?
How to do unit testing in informatica?
i have a source of n records.i have to load n+5 records to my target.What is the procedure??????plz tell me.....
What is meant by a domain?
Enlist the tasks for which source qualifier transformation is used.