enterprise datawarehouse your project phase by phase
explain?
Answer / siva
Its depend on the project scheduling..
In some projects.. it will considered as
ph1 -- Requirements Gathering
ph2 -- Analysis and framework
ph3 -- Designing
ph4 -- Production Migration, performance tuning and
maintenance activities
In other hand some projects will be set as
ph1 -- Integrating the sources
ph2 -- Creating the Datamarts and Aggregations
ph3 -- Reporting
So its depends on size and requirements of the project
Hope you got it..
| Is This Answer Correct ? | 8 Yes | 0 No |
Is stop and abort are same in informatica?
How can you validate all mappings in the repository simultaneously?
Design a mapping to load the cumulative sum of salaries of employees into target table?
IN SCD TYPE 1 WHAT IS THE ALTERNATIVE TO THAT LOOKUP TRANSFORMATION ?
When do you use mapping parameters? (In which transformations)
My source table look like ID Name Location Salary 0000001 ran tpty 1000 0000002 ram DELHI 2000 hju-hji raj hyd 1000 my target table should be ID Name Location Salary 1 ran tpty 1000 2 ram DELHI 2000 hju-hji raj hyd 1000
What is the difference between SOURCE and TARGET BASED COMMITS?
Generally how many Fact Tables and Dimensions Table you have used in the Project? Which one is loaded first Fact Table or Dimensions Table into the warehouse? What is the size of the Fact Table and Dimension Table? what is the size of the table and warehouse
What are the ETL tools available in DWH?
What will happen if we have a filter transformation used in a mapping and in the filter condition we specify 1. Yes nothing else, only the number 1. In other words, assuming we have 10 rows coming to this filter transformation as an input, how many rows will be output by this transformation when we have only 1 in the filter condition?
How will you update the row without using update statergy?
What is Micro Strategy? Why is it used for?