Hi Friends,
What are the steps involved in STLC
Answers were Sorted based on User's Feedback
Answer / samiran sil
1. Test initiation,
2. Test planning,
3. Testcase designing,
4. testcase preparation,
5. testcase execution,
6. Defect Tracking,
7. Reporting,
8. Defect rectification and
9. Testclosure Activities
| Is This Answer Correct ? | 41 Yes | 1 No |
Answer / murali
In STLC contains 6 phases.
1)Test Planing.
2)Test Developement.
3)Test Execution.
4)Result Analysis.
5)Bug Traking.
6)Reporting.
| Is This Answer Correct ? | 39 Yes | 4 No |
Answer / sharmila singh
These are the activities in STLC as per ISTQB book
1.Test Planning and Control
2.Test Analysis and design
3.Test Implementation and Execution
4.Test Evaluation and Reporting
5.Test closure activities
| Is This Answer Correct ? | 7 Yes | 0 No |
Answer / nagk24
1)Test planing -->Test lead
a)understand the project
b)Estimate the schedules
c)Estimate the required manpower and technologies(like
tool and environment)
d)Identify the risks and approach
e)Scope of the project etc
2)Test case Design--->done by testers
a)Understand the srs a,d frs
b)identify the test scenarios
c)design the test case
d)review the test cases
3)Test Execution--->tester
a)Deploy build in Test environment
b)conduct the testing and validate the application'
4)Defect/bug report--->tester
b)report the bug to developer
b)Track the status of the defect
5)Test closure-->Tester&test lead
a)Stop testing Based on
1)All functionalitys are tested
2)No new defects are found
3)Schedules are comleted
4)No risk in the project
HERE one imp point, tester no need to wait for build to test
planing and test cases designing.these are prepared before
tester getting build.test team should be ready with
plan,design and able to start test execution as early as
possible when they got build without delay.
Because planing and designing only deal with srs and frs.if
we understand the frs and srs we can develop plan and test
case design no need to wait until build reay
correct e if i am wrong
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / m deena dayal
stlc contains 6 phases there are as follows
test plan
test development
test execution
result analysis
bug tracking
reporting
| Is This Answer Correct ? | 5 Yes | 3 No |
Answer / vasu
1.Test planning
2.Test development
3.Test execution
4.Result analysis
5.Bug tracking
6.Reporting
| Is This Answer Correct ? | 4 Yes | 4 No |
Answer / sadham hussain s
1.Test planning
2.Test development
3.Test execution
4.Result analysis
5.Bug tracking
6.Reporting
| Is This Answer Correct ? | 3 Yes | 3 No |
Answer / vijayalakshmi
1.Planing Of Test
2.Analysis of Test
3.Designing of Test
4.Creation of verification of Test
5.Execution of Test
6.Performance Testing,Documentation
7.Action After Implementation.
| Is This Answer Correct ? | 0 Yes | 0 No |
Req gathering & analysis
Test Planing & estimation
Test case design
Test data selection
Test Case execution & Defet reporting
Regression and retesting
test exit analysis
test closure activities
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / karthik
1.test planning
2.test designing
3.test executing
3.test monitoring
4.test controlling
5.test closing
| Is This Answer Correct ? | 1 Yes | 2 No |
What is mean by Open Source tools?
What is the common bug u face in a web-based application. .?
can anyone write testcases for a wall clock?
in your currency project architecture?
1.. what is mean by data base testing and what are the important things you want to check while in database testing ?
How to test the Online Games?? Suggest tricks. I have experience in server-client application testing.
What do u mean by Top down approach and Bottom up approach? How will u implement these in u r project ?
In Manual testing how to test proxy servers? can u please explain with example?
where did u gather requirements? what is user acceptance testing? in real time plz send me as early as possible?
What is RTM
what is prototype testing, component testing, thread testing
what is a test case?