how we control automatic generator
i'e with to supply (main supply and local generator)
when the main supply was break to supply the local supply
automatically to begin supplying power.I now this control
circuit is the combination of contactor time delay contactor
switch and overload relay .but my question is how we combine
those component
thank you
No Answer is Posted For this Question
Be the First to Post Answer
specify the inbuilt protections in DG
What is the function of capacitor in electrical circuits?
hoe we can exlain the effect of caoacitor in fans????????
what is the interrelation between voltage current torgue speed and magnetic flux in case of different types of electric motors
why high speed tripping relay is used in protection circuit why not normal relay
what's the different between ELCB, ELR and ELS?
Which Class insulation is prefered for the sandwich Busducts ? Why?
How to put breaker in service / test position.
What is UPS and How do you maintain the UPS Maintenance? Brief Description on UPS maintenance.
0 Answers JLL, Nokia, Uttam Galva,
We have got the HT connection of 1000 KVA in which we have installed a seprate APFC panel at the PCC end & seprate KWH meter is installed. My question is that does the KWH reading shown in the meter is a part of the Consumption ???? ( approx 500 units is shown)
how ct burden,magnetising current,ratio and knee point voltage are related & derived
how to connect from a line-to-line connection to a line-to- neutral connection?