How to reduce prodction assembly time ?
Answers were Sorted based on User's Feedback
Answer / muniraj
1>production time can be reduced by reducing unnecessary
operations on the component, keep the component simple as
much as possible, which will reduce setup time.
2>component should be machined to designed tolerance. use
of advanced power tools for assembling
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / ganesh
1. Make a jigs&fixtures to reduce the assemble time. Ex. Instead of hitting the components make one fixture to press the component
2. Implement the 5s techique. it is very useful to reduce the assembly time
Is This Answer Correct ? | 2 Yes | 0 No |
what is the ejection system in mould making?
Can anybody please tell me from where I can get sample placement papers so that ii can prepare accordingly.
what amount of heat energy loss in ESP?
What is the difference between hydraulic oil and engine oil?
in i c engine why use two stage charge air cooler
SIR, PLZ GIVE ME INFROMATION FOR WRITTTEN TEST AND PI IN ISRO AHMEDABAD (MY MAIL ID:-ppdave@yahoo.com)
What is the effect if tour refrigeration system has an air?
What is the differance between Quality Assurance Plan & Inspection Test Plan
2/10=2
how to select speed of the spindle and work head for production jobs ( Internal grinding )
Explain the advantages of diesel engines?
If any machinery or trnsmission needs periodic and regular lubrication what is the best method to give?