How to reduce prodction assembly time ?

Answer Posted / ganesh

1. Make a jigs&fixtures to reduce the assemble time. Ex. Instead of hitting the components make one fixture to press the component
2. Implement the 5s techique. it is very useful to reduce the assembly time

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What do you understand by catenary cable ?

755


How can we calculate the capacity of each impeller in a multi stage pump(Condensate extraction pump having 5 stage used in thermal power station)How it varies in pumping capacity on removing different stages?

1734


What happened if the exhaust valve is leaking?

1406


"What is the remedy if due exchanging, valve broke out during engine running operation?"

1607


What is the function of thermostat in cooling system of an engine ?

670






How would you increase the volume efficiency of centrifugal pump?

1504


calculate the expantion of steel bar 2,5 long if its temperature rises from 20 degrees to 250 degrees and its co effient of expantion is 0,000011 mm degrees

383


Which outer cover is on the welding rod?

807


Under what condition the work done in reciprocating compressor will be least ?

638


safety of centeral chiller plant

1503


What are the benefits of cycloidal gears?

659


project,planning, equioment erraction &maint format. project,planning&scheduling,bar chart

2233


What is the turbine?

705


What do you do to prevent flare black?

1425


Where pneumatic system is used?

617