If one d.g. is unable to take full load of system, then
second d.g. will take care of partly Load.for this
condition RPM of both DG set should be equal.By using
Synchronization panel RPM of dg sets are match, is it true?



If one d.g. is unable to take full load of system, then second d.g. will take care of partly Load...

Answer / vinoth

For Synchronisation the following parameters needs to be matched,
*Phase voltage
*Frequency
*Speed(RPm)
In auto operated DG sets the GCP will take care of matching this parameters, In manual operated DG sets there is an option for matching the Phase voltage and frequency(i.e joystick to adjust voltage and frequency).Since the RPM is depends on the first two factors, the speed will be matched if the first two parameters are same.

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what is the principal of starting of a three phase induction motor.

2 Answers   Moser Baer,


If VFD is On but no starting commond on it. so how many outpout voltages of VFD

0 Answers  


What is different between DOL(Direct on line starter), VSD, S/S(Soft starter), and A/T(Auto Transformer)

2 Answers  


What is the difference between Droop vs Isoch Control?

0 Answers  


How much costly in percentage wise is sandwich busduct costly than air insulated busduct of any rating?

0 Answers  






How to check the efficiency of the generator , air compressors.

1 Answers   CIL,


What is dynamo?How it works and what is the function of dynamo in a DG.

3 Answers   Amrapali,


how to carried out tan delta test in 11 KV alternator ?

0 Answers  


why voltage coil in wattmeter called as pressure coil why the pressure term is used in wattmeter?

1 Answers   NPCIL,


what is the per unit cost of generation of electricity at thermal,hydro,desael,solar,gas power plant

1 Answers  


why so voltage is same in parallel circuits and current is same in series ckt?

3 Answers  


WHAT IS METHOD TO DESIGN SIZE OF A 11KV UNDER GROUND CABLE FOR A OUTGOING FEEDER FEEDING 6NOS 250KVA TRANSFORMERS WITH 5KM LENGTH OF FEEDER?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)