How Requirement is linked with traceability matrix.
Give proper example
Answer / monica
In traceability matrix, every requirement is mapped with the test case id which covers the testing of that requirement. A requirement can be covered in more than one test case. So all the test cases which are covering that requirement has be to mapped with that req.
| Is This Answer Correct ? | 0 Yes | 0 No |
what type of testing process is being followed in your company?
If a bug has high severity then usually that is treated as high priority,then why do priority given by test engineers/project managers and severity given by testers?
Who can perform the unit testing?
is it possible web application make it as executable file
1] Test Management Tool ? 2] What is tracebility Matrix? 3] What is RTM ? 4] What Is Functional testing 5] What is Regration Testing and Sanity Testing 6] Diff in Sanity and Functional Tetsing 7] Integration Tetsing 8] Diff in Primary Key and Unique Key -Should pass primary Key as null 9] What is composit Key 10] Defect Management tool in detail 11] What is Seviarity and Priority 12] Composite Key
What is the negative test cases for www.yahoo.com?
Difference between Test scenario and test cases?
What do u do if the bug that u found is not accepted by the developer and hez saying its not reproducable.Note:The developer is in the onsite location
1.what are the different types of testing techniques ?
how to indentify memory leakages after the build
what is volume,stress,load testing ?
Can any one share the domain knwoldege of Telecom Jeeva jeevachr@gmail.com