What is plant load factor?
Answer / karthikeyan
"Load Factor" is an indicator of how steady an electrical
load is over time.
If your electric billing rate includes both an Energy (kWh)
and Demand (kW) charge, your load factor can be calculated
by the following formula:
L.F. (percent) = [(Total kWh)/(# Days in Bill Cycle x 24
hrs/day)]/[Peak kW Demand]
If your load factor is low, you should look for ways to
even out your electrical usage (i.e., shift energy
intensive processes to periods of otherwise low usage).
By increasing load factor, you will reduce the impact of
monthly demand (kW) charges on your bill.
LF = average demand / peak demand
for a given period of time.
Is This Answer Correct ? | 15 Yes | 9 No |
why do we require cooling towers in case of water cooled chillers?????
plz get me the placement paper for the hindalco industries Ltd. plz mail it on ashishkmishra15@yahoo.co.in
What is the need for drafting?
Anybody please send me the papers of the reliance exam (apti and tech) so that i can go through it) mail me at raminder_verma@rediffmail.com
What is the felding arrangment of the boiler
Is it a good sign when thick smoke comes out of a Oil vapor extraction fan of a steam turbine oil sump? What does it indicates?
what is possible maximum efficiency of a diesel engine and a petrol engine?
"What is fuel oil viscosity, specific gravity?"
What are the defects in exhaust valve?
explain mechanical flyball
What is bootrom? And how it works?
Define a process flow diagram?