What are the traps ? What are the disadvantages of traps?
Answers were Sorted based on User's Feedback
Answer / prakash123
Traps are join problems in Universe.The disadvantage of
traps are
1)In accurate date
2)cartesian product
Cheers
Prakash
| Is This Answer Correct ? | 7 Yes | 2 No |
Answer / praveen
Traps will occur because of cardinality.
Traps are of 2 types:
1) Chasm trap
2) Fan trap
Disadvantages of traps are
More number of results
Cartesian Product
We can resolve traps by using both Alias and Contexts.
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / babu
Traps are recives inacuurate data in report level, we need
to trace it by Manually.
A.Fan trap
B.Chasam TRap
A .If tables are joined as A(1:M)-->B(1:M)-->C we will get
more results than expected. through Alaias or Agg Awarenees
we can resolve. this is called as Fan trap.
tables B holds the Aggarigated values from A table then
only we will encounter fan trap is occured.
B. if tables are joined like B(m:1)<--A-->(1:m)C. This
CHASM trap can be resolved by executing separate query for
each measure and then merging the results.Use detect
context automatic tool to detect possible context in
universe and use them in order to avoid CHASM traps.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / kodandapani.ancha
Traps nothing but joint path problems in the
universe..disadvantage is results is ambiquity..to resolve
| Is This Answer Correct ? | 0 Yes | 1 No |
Where will you find the address of repository in Business Objects?
Can more than 1 metric be applied on an analytic in business objects?
which is the best way to resolve loop context r alias why?
Ranking feature was not available in WEBI 6.5 version,So how can we get ranking in WEBI 6.5 version?
Can any body will explain about sarrogat key? Thanks in advance...........Prakash
what is confirm dimension ?
is there any way to know how long the report executes and how many records will be returned before hitting the "run" option?
How to link two different universes ?
in a database date formate is in dd/mm/yy. In my report I want when I prompt the date coloumn it should be displayed in (yyyy/mmm/dd)format. how could I do this plse send me as soon as possible.
What is the difference between Report Bursting and Report scheduling?Explain both of them in detail?
what is isolated joins in check integrity
when to go for alias and when to go for contexts