Mohan started running from point A along with a circle of
1400 meter radius with the speed of 12 Km/hr. Ram also
started running in the opposite direction from the same
point with the speed of 15 km/hr. Both started at 9:00 AM.
At what time will they meet first time? 9:15 AM
9:25 AM
10:00 AM
9:20 AM
None of the Above
Answers were Sorted based on User's Feedback
plese,send to me the sbi clarical bank exam form.
1 Answers State Bank Of India SBI, TCS,
A man, a woman, and a child can do a piece of work in 6 days. Man only can do it in 24 days. Woman can do it in 16 days and in how many days child can do the same work?
why the meena categery candidates ...top the competative exam?
in a market 4 man are standing .the average age of the four before 4 years is 45, after some days one man is added and his age is 49. What is the average age of all?
Length and breadth of a rectangle are in ratio 7:5. If length is reduced by 5 and breadth by 2, area reduces by 65. Find length and breadth.
The average salary of 3 workers is 95 Rs. per week. If one earns Rs.115 and second earns Rs.65 how much is the salary of the 3rd worker.
Pankaj walks east and turns right and then from there to his left and then 45degrees to his right. In which direction did Pankaj go?
In a group of 15,7 have studied Latin, 8 have studied Greek, and 3 have not studied either.How many of these studied both Latin and Greek
To 15 lts of water containing 20% alcohol, we add 5 lts of pure water. What is % alcohol.
0 Answers 3i Infotech, Canara Bank, Geodesic,
Wall of 88 m. Man climb 12 and falls by 8, when he will reach at top?
13 Answers 3D PLM, TCS, Zoho,
Past question on Chevron's interview tests
The IT giant Tirnop has recently crossed a head count of 150000 and earnings of $7 billion. As one of the forerunners in the technology front, Tirnop continues to lead the way in products and services in India. At Tirnop, all programmers are equal in every respect. They receive identical salaries ans also write code at the same rate.Suppose 12 such programmers take 12 minutes to write 12 lines of code in total. How many lines of code can be written by 72 programmers in 72 minutes?