Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


1. A single acting stage air compressor with 6% of clearance
volume compresses air from 1.2 bar to 6.5 bar. Find the
change in volumetric efficiency if the exponent of expansion
process changes from 1.55 to 1.72.

Answers were Sorted based on User's Feedback



1. A single acting stage air compressor with 6% of clearance volume compresses air from 1.2 bar to ..

Answer / dev

89.97-72.38=17.597%

Is This Answer Correct ?    1 Yes 0 No

1. A single acting stage air compressor with 6% of clearance volume compresses air from 1.2 bar to ..

Answer / arun

17.597%

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Mechanical Engineering Interview Questions

send me vizagsteel papers (m.t.. please.)

0 Answers  


Name the operation which can be performed by lathe machine?

0 Answers  


What is the critical speed. Compare the critical speed of hollw shaft and solid shaft.

0 Answers   Cummins,


how can i identify various hose fitting threads

0 Answers  


Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

0 Answers   Saudi Ceramics,


Pro-e(modeling software )work on which programming language ?

0 Answers  


How cavitation can be eliminated by pump?

1 Answers  


• Have you ever been asked to leave a position?

1 Answers   Petro Star Mount,


• How do you see the future for this industry?

1 Answers   Petro Star Mount,


What are the various machining processes?

7 Answers   HAL,


what is bulk density

3 Answers  


Explain what are the thermal conductivity properties of brass?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)