Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
1985Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M hight 3.75 meter 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
2052how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
1621I am called for interview from north east power plant .so, I need some interview question which may help me.
1790how many bricks required for below volume 1. depth filling 0.00 Qty 1.61 & Unit Cu.M 2. D-Filling 300 Qty 2.0 & Unit Cu.M 3. D.Filling 450 Qty 2.24 & Unit CU.M 4. D-Filling 600 Qty 2.44 & Unit Cu.M
1 2559Post New Civil Engineering Questions
what is the construction cost for per cft of multistorryed building in kolkata?
Did any of the egyptian pyramids ever fall down?
What is 1/8 on the architect ruler denotes?
how many shuttering material required for 1000 sq.m built up area.
how to calculate freeboard in under ground water tank and technical details
in one SQM plaster how much Cement and sand consumed in ratio 1:4
What is a hatch patterns?
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
how to calculate reinforcment in staircase cranked beam?
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.