what is the salry which I am expect in kolkata for diploma in civil engineer with 3 years 6 month exp.???
6 9190if the length and breath of footing is 1.2m x 1.2 m what will be the length and breath of foundation trench
5 9603Post New Civil Engineering Questions
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
what is Brick crushing strength(PSI)?
how many tonnes equals to one cubic feet?
What is horizon or horizontal mining?
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
roll of DLC in road constructions
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
in plate load test what is the thickness of plate 20mm 5mm 50mm none
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
Define What is a projection line?
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
Special thing in designing a overhead reservoir ? which is different from an ordinary design