what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
2552WHEN BRICK SIZE IS 3X5X9" , WHAT WOULD BE THE NUMBER OF BRICK REQUIREMENT FOR 100 SQFT AREA OF 5" width?
7 12268how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
Omex,
2247Post New Civil Engineering Questions
why & what is perchatage we are using fly ash in concrete?
Which is stronger solid steel rod or hollow steel pipe?
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
what is the clear cover for shearwall?
how meny typs of renging rod?
What are the disadvantages while using stone dust as filler in pavements?
How to find permissible diagonal tensile stress in reinforced brick work
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
What is made from large rocks, which protects the base of cliffs?
how to caluclate sienerge qty in construction in ap
Explain the design for rcc multi-storied building?
What is the ideal size of the living room ranges from small to large size?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
sir how can we find the cement and sand required for making 4" drop