How to find quantity of cement mortar? I want to know the req quantity of cement for plastering 300 sft in final coat with 12 mm. Any math involved? Plz help
31 82749Post New Civil Engineering Questions
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
What is the development length given in pile?
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
For what building Built-on balconies are preferable? What are the advantages?
What is demising walls?
Coverage of 25mm.thick ratio of 1:4 cement mortar?
how water proof chemicals act in concrete to avoid leek?
What quantity of 1.0 m3 bricks required?
Advantage of Aluminum form work in terms of activities can be skip and cost too
What is meaning of tlc
What is the Roll of Water Bonding under VDF road?
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
what is the construction cost for per cft of multistorryed building in kolkata?