Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) Boolean algebra
I am pavani pursuing 4th B.Tech final semester i want to write the Group 2 Examination , Eligibility of that exam is all degree holders but to hold my Degree 3months are more. but the exam held on 3rd July 2012. i would be complete my B.Tech when exam to be held. so am i eligible to Group2 exam or not , please clarify my doubt.
what is dry and wet frequency withstand voltage? why & where it is used??
what is machine tpm
how to determine ct ratio in ht vcb?
why centrifugal pump used in I.D.fan and axial pump in F.D. fan
what is difference between controlnet,devicenet protocol?
flow transmitter formula?
what is the difference betweeen far pointer and near pointer
What happen if we install flow meter with orifice plate, but bevel position is in upstream and not in downstream
if field breaker of generator is closed prior to its rated speed on a power generating unit. what will be the effect on generator, unit transformer and starting transformer.
What is intrinsic semiconductor ?
What is the name of this multiplication factors ?
we are having 110 Kv,250mA Electrostatic precipitators for coal fired boilers. what will be static voltage and current after discharge and what time it will remain before earthing?
How many % we consider for lap for reinforcement for estimates