1,why we use 4-20 ma output of all instrument qhy not use 0- 20, 2,what is the different between PLC & DCS. 3,how can we meaure maximum span of new flowmeter if not given any information.
4 12702how can we calibate ph meter. how can we calibrat conductivimeter how can we calibrat massflowmeter & it s working.
1 3484how to install the Ph and Conductivity analyser? is there are any procedures which has to be maintained.
2 5988Hi, I'd like to know the purpose of MOS (maintenance override switch). At site, these switches are installed in a stanchion with the transmitter (connected to ESD). thank you.
3 36174what happen if i increase height of displacer type LT.accuracy or sensitivity are affected.why?
2528Post New Instrumentation Questions
what is function of sensor, and how is it work , explain with difination
what is isloted barrier how it works and what are the main purpose.how it make safe area.
What is the difference between uv and ir scanners? and what is the workig principle of both
Hi i m B.E. In elect. & comm. I m workin in bio mass plant from 6 mnths as inst. Engg. but now i m in dept. Of operation as shift engg...which is best operation or inst. 4 me? M confusd..plz help and reply me..
what is diffrance between FF & SMART, explain with difination
Tell about your IFFCO plant visit.
i hav applied for the post of engg. in iocl so please require the past test papers fro instrumentation engg please please help me and send me the papers or tell me the pattern and type of ques asked in examination......
Which is your favourite subject & explain any one topic of it.
what is installation and commissioning of (fat & sat) of power plant dcs ? this question keeps in desirable conditions of one company .
flow transmeter accuracy 0.075% of full scale & find ucertainty is 0.025 % so what is maximum limit band of uncertainty
What are the uses of orifice plates?
what is maxdna ?. explain about the software details.
control panel design guidelines
Can combine control system for Emergency control system (ESD)and Fire & Gas System ( F & G) is possble to built and offer to client? Can such system is as per Norms in India?
Why do we have earthing cable in branch cable and shield in the same cable?