Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

HCC Interview Questions
Questions Answers Views Company eMail

how to find motor contactor rating and bimetalic relay rating? of 30kw motor which will operate on star-delta starter?

6 21573

How many times one TMT bars bents & straight upto not broken the bar.

5 16306

What is meant by 'zero value' in quantity surveying.

10 43169

What are new technologies in civil engr. that can reduce construction cost?

2 8676

hi frnds i hav got thro BHEL written exam..wat to prepare for intervw..guide me plz!!!!!!!!!!!!!

6 13254

In General Business scenario we use cost center for cost collection and for short term or special purpose we use Internal order. If we use Internal Order insteed of cost center accounting so what happend. any data volume or periodic lost data we face.

1 5168

WHAT THE DIFFERENCE BETWEEN JCB 3DX & 3D?

7 44961

which is batter in construction job,ELCB or RCCB?

7 18497

What is the unit weight if concrete?.

28 122629

DEFINATION OF CIVIL ENGINEERING

13 22335

why we r not earthed Control cable of C.T. terminals

2028

How much quantity of water required for curing of: 1) For concrete of 10cu-m or 10sq-m 2) For blockwork of 10sq-m 3) For plastering of 10sq-m

10469

what is meant by MIS report

7 16418

What is working principle of ACB and VCB?

9 71109

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.

19 194117

Post New HCC Interview Questions




Un-Answered Questions

What does the enableviewstatemac setting in an aspx page do?

1045


What is an eip?

341


Differentiate accounting and auditing?

1125


what are abstract functions?

1024


What is a 404 error?

848


What is purpose of liquescence digestive enzyme?

869


Why we use windows operating system?

914


how apb protocol has a minimum power consumption?

4216


what is the nature of bill receivable and consignmenta/c

2414


How do I clear the screen in sql plus?

1035


What is trim function in php?

1064


Explain indirection?

1124


Can a constructor be made final?

1105


MY generator water cooler inlet line height - 11 mtr inlet water line height - 7 mtr water come into the line from overhead tank, O/H tank height - 20 mtr the first tapping in the inlet line is 2" line which down to 4 mtr level plateform., second tapping in inlet water line goes to a pump 6" line installed at 4 mtr level plateform, pump capacity 200m3/hr, head- 30 mtr, hp-40. the outlet of pump of 6" water line connected to a header of 6 mtr long of 6" line, on this header the six tapping are connected, 4 nos. 3" line goes to 11 mtr height water cooler the pressure of the line is 0.15 to 0.25 kg/cm2, 2" and 4" pipe line connected to a cooler at 4 mtrlevel plateform. my question is, at 11 mtr height level the quantity of water and flow is not sufficient for my cooler, the temp. of cooler is rises much more. you are requested to suggest the modification of pipe line/ pump for take more water flow and pressure (desired pressure is 1 kg/cm2)

2383


What is the object in salesforce?

439