Hi, I am an MBA with 2.8yrs of experience into HR and very much interested to get into the career of ERP i.e Oracle Apps HRMS...Pls let me know if any openings for freshers in OracleApps HRMS. Regards, Preeti.
11 23559why for transformer protection we protect tranformer from 3rd hormonics and 5th hormonics and what is the reason of generating these horminics in electrical system?
2 9585In step down transformer (415/200V),mistakenly secondary side is connected to 415V for some hours, what would be result of this condition?
19 28790As all us know that the capacitor panel is connected to improve the power factor when it is PF is low. whether we can connect the capacitor panel on D.G. side(? If it is yes means why?
1 6300Post New Essar Interview Questions
What is the equivalent of dll in linux?
does buccholz in a transformer use batteries
How do we go with database connection and log4j integration in servlet?
What is meant by wsdl?
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
How the MIS format made up in XL.
Is flexbox a framework?
What is integrity and what is constraint??Explain with example
What type of connections designer provides? : bo designer
How is an sql query executed in oracle 8?
Explain the difference between access specifier and access modifier in c#?
What is big data in dbms?
Is learning data structures necessary?
Can I use speech to text in word?
You are a project manager for Safari Outfitters. Your company is going to offer a new product line in the upcoming spring catalog. Your project team has 10 months to secure contracts with suppliers, finalize the designs, get the product into the catalog, and stock the warehouse. This is an example of: A. An assumption because the project team has worked on projects like this before and know they can meet the 10-month deadline B. An assumption because the project team has a limited amount of time to complete the project C. A constraint because the project team has a limited amount of time to complete the project D. A constraint because the project team is working with a new product line that hasn't been developed before