tell me quantitys of matal, sand and cement in 1:4:8 and
1:2:4
Answer Posted / vishal kumar chy
1:2:4 It means 1 unit of cement, 2 units of sand , 4 units of aggregates
Is This Answer Correct ? | 13 Yes | 2 No |
Post New Answer View All Answers
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
What is the snap size in civil and how can we create it?
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
How can we demolish concrete beams?
What is type failure of road surface? how to repair the failure of road surface?
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
How do we test on design and style in a software?
How many pyramid in egypt?
which formula used for calculate the area of segmental arch?
how many litres of enamel paint required for 5000 sft of site??
Minimum and maximum size of the building components
How to calculate steel for beam slab and column
What is the origin of name railway sleepers?
what could be the production cost of 1 cum of concrete by CP30 plant