tell me quantitys of matal, sand and cement in 1:4:8 and
1:2:4

Answer Posted / vishal kumar chy

1:2:4 It means 1 unit of cement, 2 units of sand , 4 units of aggregates

Is This Answer Correct ?    13 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail

3625


What is the snap size in civil and how can we create it?

2390


what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?

2739


How can we demolish concrete beams?

1866


What is type failure of road surface? how to repair the failure of road surface?

2084






for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help

1654


how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.

2063


How do we test on design and style in a software?

760


How many pyramid in egypt?

723


which formula used for calculate the area of segmental arch?

2451


how many litres of enamel paint required for 5000 sft of site?? 

1574


Minimum and maximum size of the building components

1866


How to calculate steel for beam slab and column

1452


What is the origin of name railway sleepers?

952


what could be the production cost of 1 cum of concrete by CP30 plant

1362