how can change 10mm dia @130c/c bar spacing to 8mm dia

Answer Posted / rajesh kumar jha

spacing = ast/Ast
130 = 8*8 / Ast
Ast =64 / 130
Ast = 0.492 then after

spacing = ast / Ast
= 10*10 /0.4925
= 203
spacing = 200

ASt = area of steel
ast = area of bar

Is This Answer Correct ?    16 Yes 16 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is hydrostatic paradox?

1715


find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.

1808


Can we use the flyash bricks in brick bat coba?

1076


Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand

1266


importance of the soundness test to determine the quality of cement use for any construction

1699






what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same

1715


when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?

1906


How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.

2190


What are the different types of runners?

686


What is gravity flow?

685


How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance

2433


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1950


What is the difference between EPC,DBOOT and BOOT.

23382


what is your role of in previous company as a construction manager

1574


Process of pcc in wateredug

1804