why the steam turbine is not operated in home(base) load
more than 1 hour kindly calrify
Answer Posted / yogesh k. patil.
During underload or FSNL operation, Exhaust steam temperature increases as less heat is converted into electrical energy.Underload operation of steam turbine,like 0.9MW for a 20MW turbine is allowed for 1hrs by manufactures like seimens for SST300 turbine.But in case of emergency wher exhaust hood cooling is impelmented, that can be extended.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
By any way can we increase the B check hours from 300 to 500
our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
what is the trip circuit supervision in an electrical meaning?
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
How do you consider that you can improve and what assistance do you need to achieve this
im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much
why do you consider yourself a suitable candidate for this position
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.
what is the meaning of SST300 V56A in SIEMENS turbine
explain how the third harmonic content of the magnetising current affects transformer design
What is LB-SR.
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
what is restricted earth fault explain in details
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon