why the steam turbine is not operated in home(base) load
more than 1 hour kindly calrify
Answer Posted / yogesh k. patil.
During underload or FSNL operation, Exhaust steam temperature increases as less heat is converted into electrical energy.Underload operation of steam turbine,like 0.9MW for a 20MW turbine is allowed for 1hrs by manufactures like seimens for SST300 turbine.But in case of emergency wher exhaust hood cooling is impelmented, that can be extended.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.
explain how the third harmonic content of the magnetising current affects transformer design
what is restricted earth fault explain in details
our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....
what's the moog valve
operation
How We Calibrate the vaccum transmitter?
procedure of how to generate power in solar plant.
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
What is difference between secondary Air & Tertiary Air and Their use.?
why airtel use + 24 volts and other operators use -48 volt
what is the difference between compensated & normal drum level in boiler drum?