can we use 220 volt 15 w a.c. lamp on 220 volt d.c.
Answer Posted / barbara wild
sorry i ment lightbu
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is load boxes ?
PLEASE ANYBODY HAVE ELECTRICAL CIRCUIT DIAGRAM FOR CHMER PULSE CD 60M SPARKING MACHINE.PLEASE MAIL ME SUPRIYAAYYAPPAN@YAHOO.CO.IN.
How you will determine the volume of oil in a particular Distribution transformer.
A parallel flow heat exchanger will perform better than a counter flow heat exchanger. State if the statement is true or false.
i m electrical diploma holder i want to do plc $ Scada some body tell me which insitute is best for me near chandigarh
What is the BS(British Standard)code for 11kv motor
What are the conditions to be satisfied for parallel operation of dc generators?
How harmonic block test are conducted on relays ( Siemens,Areva ect )power transformer using omicron kit?
What happen when change order of CT in GIS feeder?
I have made a 3 phase thyristor full bridge rectifier. But at the moment it is working only for the half bridge operation. Both the half bridges are on operation separately but when i put it into full bridge operation the oscilloscope output is zero. I rechecked that the pulses are correct for each thyristor. what could be the possible reason for this?
PLZ SEND ME SOME UNIQUE PROJECT OF ELECTRICAL ENG (B.TECH)
1.main parts of generator? what is used A-check,B-check,C- check? 2.what is FM200 system in data centers? 3.difference between pac,ahu?
How to calculate KVA/VA rating of PT or CT from primary & secondary voltage or primary & secondary current?
What is grid collapse? what is the reason for it?
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.