How to calculate sand,cement for 1:5ratio brick masonary
Answer Posted / shashi roy
.26cum sand required 4.
1cum brick work
then.26/5=.052
.052×1440=74.88
74.88/50=1.497bags
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
How will you Engage Labours on Site?
how many minimum admixtures are used in water froofing structures
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
How much quantity of rod binding work by a rod binder per day
length where bent up is made in slab of bridge from one end
What are the problems one might face while having a Cantilever balcony?
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
what is your role of in previous company as a construction manager
what would be the design load of R.C.C Cooling tower per cell.?
detailed calculation of the amount of cement used?
how much area can be platered by a mason for exterior
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?