Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

keeping in view of parallel operation which of the 3 phase
transformer connection are possible?
a)delta-delta to delta-star b) delta-delta to star-delta c)
star-star to delta-delta d) delta-star to star-delta

Answer Posted / vikas tomar

If the transformers are star-star or delta-delta, they can
not be paralleled with star-delta or delta-star,As there
will be the phase difference of 30 degree b/w the secondary
voltages for the same supply voltages across the primaries
of the two transformers.It will result the circulating
current in transformer windings.
Hence option (d)is correct answer.

Is This Answer Correct ?    6 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

A mass of 1200g is accelerated at 200 cm/s2by a force. The value of the force required is:(a) 2.4N(b) 2400N(c) 240 kN(d) 0.24N

2883


What is the ratio of Booster transformer?

2112


Can we use Ccapacitive voltage transformer directly for metering purpose?

1777


CT Ratio of a energy meter connection is Red Phase : 100/5A, yello Phase : 50/5A & Blue phase : 100/5 A what is the overall Multiplication factor

1600


i need mat lab program to find out the transmission line losses,regulation and losses

1849


What is the slip speed?

1037


what is meaning of bus riser

2459


What are your future plans for the company if permanently employed?

2111


We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.

1899


Mention the methods for starting an induction motor?

1092


if 3400kw slipring motor rotor shorting done and motor started on mv drive ,what will be the rotor shoring current

1625


i want to run 11kv star connected motor in 6.6kv with delta connected throught inverter, is it possible?

1978


Can we transmit digital signal to long distance ?

1893


How to Design green buildings services? What is the advantage to design green building?

1743


How much of the total hydro power potential has been exploited so far in india?

1043