how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?
Answer Posted / misal dinesh
Take The Ratio - 1:1.5:3
For 1 cu.m wet volume consider its dry volume 54% more
i.e = 1.54 cu.m of concrete.
Total Volume of concrete for Mix= 1.54/1+1.5+3 = 0.28 cu.m
Total quantity of cement for Mix= 0.28/1 = 0.28 cu.m
Total quantity of cement in bags= 0.28/0.035 = 8 bags
Total quantity of Metal for Mix= 0.28/1.5 = 0.187 cu.m
Total quantity of sand for Mix= 0.28/3 = 0.093 cu.m
| Is This Answer Correct ? | 9 Yes | 7 No |
Post New Answer View All Answers
what is the calculation of raw material for 0.35cum of m-15
afe or not
What are the basic use of runners and standards of pipelines?
residential buildings,mixing of concrete,structural,construction material,site handling.
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
What is Joule Brayton Cycle?
how we calculate the vol.of wet concrete..?
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
What things architect have to take care of before starting any project?
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?
Water filter calculation formula
how much of the strength comes from post-production curing
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?