Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?

Answer Posted / k.nabadwip sharma

Calculation for Cement:-

100 cft of conc in loose 144 to 154 cft required,average of
144 and 154 is 149 cft say 150 cft.

M25 = 1:1:2=4

150cft/4=37.5cft
37.5cft/1.2=31.25bags [1 bags of cement is 1.2cft]
=31.25/2.83=11bags [1 cft = 0.0283cum x 100 cft=2.83cum]
per cum cement required=11bags

Calculation for Sand:-
11bags x 1.2 cft = 13.2 cft = 13.2 x 0.0283=0.374 cum
Per cum sand required = 0.374cum

Calculation for Aggregate:
=0.374 x 2 = 0.747 cum
per cum Aggregate required = 0.747 cum

Is This Answer Correct ?    1 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Material calculation of cm 1:6 for 1sqm

1984


what are the values of compressieve strenght?

1998


how to calculate testing date

1644


Coverage of 25mm.thick ratio of 1:4 cement mortar?

1855


contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?

2281


Explain what is alternate bid?

1228


Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?

2416


how much cement and sand required for 1cum rr masonry

4923


How do you compute the volume of airflow?

1063


How can i do RCC rate analysis?

1638


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

2079


What do you mean by the word 'shear'?

2218


What is .Dwg?

1246


all technical question

2202


What are the main reasons for conducting pull-out tests for soil nails?