how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?
Answer Posted / k.nabadwip sharma
Calculation for Cement:-
100 cft of conc in loose 144 to 154 cft required,average of
144 and 154 is 149 cft say 150 cft.
M25 = 1:1:2=4
150cft/4=37.5cft
37.5cft/1.2=31.25bags [1 bags of cement is 1.2cft]
=31.25/2.83=11bags [1 cft = 0.0283cum x 100 cft=2.83cum]
per cum cement required=11bags
Calculation for Sand:-
11bags x 1.2 cft = 13.2 cft = 13.2 x 0.0283=0.374 cum
Per cum sand required = 0.374cum
Calculation for Aggregate:
=0.374 x 2 = 0.747 cum
per cum Aggregate required = 0.747 cum
| Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
how much repeitation for conventional and maivan formwork?
what would be the design load of R.C.C Cooling tower per cell.?
What is the origin of name railway sleepers?
sir please send me campus placement questions in civil engineering
Howmuch bend to be provide for 200/600 BEEM
Define What are the materials used in building a gravity dam?
What Are The Steps Involved In The Concreting Process, Explain?
what is column foundation
Permissible wastage of cement as per IS code ? In which IS code I get it?
What are the basic use of runners and standards of pipelines?
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
115mm thickness brick work how to required mortar
How much material will consume for following specification water tank (9*7.5*6 feet)?
How do we test on design and style in a software?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.