how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?
Answer Posted / k.nabadwip sharma
Calculation for Cement:-
100 cft of conc in loose 144 to 154 cft required,average of
144 and 154 is 149 cft say 150 cft.
M25 = 1:1:2=4
150cft/4=37.5cft
37.5cft/1.2=31.25bags [1 bags of cement is 1.2cft]
=31.25/2.83=11bags [1 cft = 0.0283cum x 100 cft=2.83cum]
per cum cement required=11bags
Calculation for Sand:-
11bags x 1.2 cft = 13.2 cft = 13.2 x 0.0283=0.374 cum
Per cum sand required = 0.374cum
Calculation for Aggregate:
=0.374 x 2 = 0.747 cum
per cum Aggregate required = 0.747 cum
| Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
about higyway engineering
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
What is thumb rule in quality and quantity estimation of a Residential building??
How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/
which has high compressive strength between hollow block and brick masonry?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
Volume of 25kg putty bag & 40 kg putty bag volume??
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
rimmer in pile foundation
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
how to tie 10 legged stirrups
What is the usage of zoom command?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.