why the capacity of power plant is given in MW though the
generators are rated in MVA?
Answer Posted / lalit
if we talk about the generator then we have to classify the
active power as well as reactive power i.e. V*I because the
reactive power is also used in generator for the excitation
purpose( for flux production). hence its rated as MVA in
other hand, for power transmission only active power is used
i.e. VICos theeta. hence its rated as Mw.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
-What shall be short circuit current of LV switchgear for a 1000 kva, 11.415kv, 3 phase tranformer with 5% reactance.
What is the formula for calculating no-load current?
How many types oil using in transformer ? How many letars using in transformer..?
How to do bus bar short circuit calculation for 230KV/11kv, 60 MVA Substation?
nwhat are the main Components of servo motor?
What is d main advantage of using double circuit 3 phase transmission ?
all the technical question with answers pleas send your email id ramar_eee@yahoo.com
what is tri state logic gate
What will happened if the neutral of the (star connected secondry) Xformer disconnected? (if its Above KVA rated one)
How to select circuit breakers rating eg. if i select a circuit breakers of capacity 40 amps DC with operating voltage 28 volts and if i what to use same circuit breakers for 300 Volts DC application what is the current rating of this circuit breakers.
A parallel flow heat exchanger will perform better than a counter flow heat exchanger. State if the statement is true or false.
DEAR SIR/MADAM,CLEARLY EXPLAIN ABOUT CRAWLING AND COGGING EFFECTS IN INDUCTION MOTOR.
I am going to appear RRB Sr. Section Engineer Exam, Electrical. Can you send me previous year questions of RRB Electrical engineer. specially Section Engineer questions. my email id is likerahulworld@gmail.com
how can we understand that where we have to use ac or dc coil for solenoid valve and why?what is the different between coil of ac and dc explain please.
what r the checklist while installing 500 kva transformer