how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?
Answer Posted / fsdfsdfsdfs
For m30 8 bags cement
Is This Answer Correct ? | 37 Yes | 23 No |
Post New Answer View All Answers
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
how clculate excavated or backfilling quantity by simpson's rule
Cement consumption of one cubic meter of aerocon blocks masonry?
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
What are the applications of modulus of elasticity?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
length where bent up is made in slab of bridge from one end
what is BPM in concrete demolition hammers. what is better a higher value or lower
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
what is the difference between replacement of cement by groundnut shell ash
how many digree of freedom in four bar chain