how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?
Answer Posted / samsulhoque@jadavpur universit
for m30 grade .we have to calculate the quantity of all
ingredients of concrete by design mix as per IS
10262-2009.it depends upon the whether admixture is used or not.
| Is This Answer Correct ? | 50 Yes | 31 No |
Post New Answer View All Answers
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
Questions related to civil.engg in company
where can i get the previous question papers for rrb section enginerr (civil)
how to caluclate sienerge qty in construction in ap
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
how much repeitation for conventional and maivan formwork?
1:4:8 pcc calculation 591 cu.ft
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
How foundation is designed, Column design and beam design
How many square meter can mason layout chb per hour
how we check the thickness and line of ceiling plaster.
How can you produce desired alloys and discuss their applications in daily life.
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
how to calibrate the RM 800