how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?
Answer Posted / subilash .s(civil engineer)
for designing 1m3 concrete of M25 mix the ratio is 1:1:2
for calculating cement,sand and course aggregate ,
cement= 1/(1+1+2)=.25
density of cement =1440kg/m3
cement required for this mix=1440*.25=360kg=6bags+10kg
sand=1/4=.25m3
course aggregate=1-.5=.5m3
this methode of designing is known as volume batching ,this
methode will be ues to design mixes upto m25.
Is This Answer Correct ? | 86 Yes | 69 No |
Post New Answer View All Answers
about higyway engineering
Civil engineering related
mean of NH4 pipe
During reclamation how can the occurrence of mud waves can be rectified?
Explain what is zoning permit?
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
what is E
what is your role of in previous company as a construction manager
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
When column of building is abutting the boundary line,then suitable footing advised is
What is a hatch patterns?
in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
TELL ME THE EQUATION FOR OGEE SPILLWAY
which formula used for calculate the area of segmental arch?