Hi All,

This is regarding ETL testing. I have 3.5 years of
experience in software testing. I have used web and DB
testing so far. I am currently projected for ETL testing by
using which is very new to me. We are using Informatica for
running the sessions and taking the logs. I would like to
know whats the process we have to follow for this testing.
Ie., From kickoff to signoff. Can please anyone give brief
explanation on that.

Do we have any certification for ETL Testing??

Answer Posted / wayne yaddow

Please note that I have sent a few of my ETL and data
warehouse testing documents in a zip file to all of the
first 37 persons above who inlcuded their email address.
Hopefully, all will receive the file; it is large, but I
have tested that many received it with no problems.

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain test plan?

592


What are different types of protocols used in transportation and session layers of SAN?

1432


What is different type testing you done when doing webbase application.the desktop application

1505


What is the one key reason why developers have difficulty testing their own work?

806


What is the difference between the white box, black box, and gray box testing?

591






What is technical review?

584


Hello, I would like to know which all versions of Testing tools (load runner, winrunner, qtp, test director) are no longer used and which versions of these which are being used?

2133


what is system testing?

1576


What is clear box testing?

600


Mention what the difference between pilot and beta testing is?

578


What is disaster recovery testing?

593


What is the bottom-up approach?

643


What is test schedule?

751


The Following Characterstics posses some XYZ company. * Uses formal standards and policies * Conducts software inspections * Has advanced configuration management and change control * Uses CASE tools * Has a software engineering process group * Gathers metrics on process and quality * Requires that developers have formal software engineering training * Practices continued process improvement Based on aboue , Tell me which CMM Level is the company..? 1. Level 1 - Initial 2. Level 2 - Repeatable 3. Level 3 - Defined 4. Level 4 - Managed 5. Level 5 - Optimizing

1691


What is test specification?

630