how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?
Answer Posted / rajarshi basu
The approach by Sjtbehera is totally correct but has some
little silly mistakes...I have tried to give a rectified
solution.
In the case M30 design mix, the quantities of cement,sand
and aggregates cannot be calculated as it is a variable
quantity.It depends upon the Mix designer how much quantity
of cement,sand and aggregates he will employ.His only
intention would be to design a mix whose specified
characteristic compressive strength at 28 days=30 N/sq.mm
But in case of nominal mix we can use 1:1:2
Let us consider a volume of 10 cu. m (Wet concrete)
It is difficult to access exactly the amount of each
material required to produce 10 cu m of wet concrete when
deposited in place.
Hence to convert the wet volume into dry volume,
Increase by 54 % to account for shrinkage and wastage
Thus it becomes=15.4 cu. m (Variable upto 15.70)
Calculating cement, sand and aggregates in the mix:
Total summation of proportion=1+1+2=4
Cement = 15.4/4= 3.85 cu. m =3.85/0.0347=110 bags
Sand=15.4/4=3.85 cu. m
Aggregates(20mm to 6mm)=15.4 x (2/4)=7.70 cum
Hope u have understood and the mistake is clarified!!!
Is This Answer Correct ? | 174 Yes | 65 No |
Post New Answer View All Answers
How to calculate the quantity of ingredients of M20 grade concrete?
Define polar co ordinates.
I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
What are your future hopes for this job?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
on what basis the partial factor of safety are decided? form the load combinations
what is meant by residual strain?
what is the exact dia of 8swg and 10swg gabion wire
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
What are the different types of runners?
How can i do RCC rate analysis?