a 25kvar capacitor bank connected to the secondary side of
transformer.then why the capacitor draws more current then
rated
Answer Posted / arvind
if you are connect capacitor on the secondary side that
means you are correcting the power factor of load side, but
if you put the bank on the primary side then u will notice
the current required will be less.
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
How to configure the drives in PLC, through Profibus commnication. And to how to address it?
If I want to connect a capacitor bank on the HT side of a 11kV/415V, 3 phase delta-star distribution transformer to supply Reactive power to it..what practical specifications of a Capacitor bank that can i've??please reply..
Explain the experiment on ward leonard method of a speed control on a dc shunt motor with an suitable circuit diagram.
What happens if the Capacitive Voltage Transformer Primary neutral is not earthed. There is a CVT between Transformer and source, and the CVT neutral of the transformer is not earthed, does it effect the transformer while charging or does it effect the transformer charging process.
difference between a diode and thyristor?
What does the letter CTNM in negative phase sequence relay means?
Can any one know what are the symbols at the down (below) the analog ammeter??? there are 4 symbols which are they ?????
I want formula to calculate cable size as per load given in length & amp. I searched many sites but didn't right answer. Please reply me asap.
please send me privious exam's queation papers of section engineer(electrical).
What is the function of attenuator in cro?
What is the effect on Power factor and capacitor when your company load is more than 70 % of welding transformer
Which is the largest hydropower station in the world?
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,
Please sent me some previous year question papers of BSNL-JTO telecom and RRB in ELectrical Engineering to varshashahi@yahoo.com
I am EEE student i want to improve my core side skills.how cn i approach it?