tell me quantitys of matal, sand and cement in 1:4:8 and
1:2:4
Answer Posted / kailash
1:2:4 & 1:4:8 its not a standard design. design depends
upon the which aggregate available at site and there
density.
| Is This Answer Correct ? | 10 Yes | 10 No |
Post New Answer View All Answers
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
What are the advantages of cad?
Slump Values for works?
what are the proper pipes for salt water line
What are the basic use of runners and standards of pipelines?
at what pressure ply-wood is obtained by gluing wooden sheets
How do we calculate the power of centrifugal pump?
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
What you understand by richter scale?
What Are The Different Type Of Slump Test Indications?
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
Civil engineering material testing Standard results
What are the different types of runners?