Please explain about FAT? What is the difference between
FAT and SAT?
Answer Posted / gnb
FAT: It will be conducted at System Supplier's place with
presence of EPC and End user.They will check the
functionality of Control loops and logics with use of
Simulators.Third part devices will also physically
connected to the system supplier and functionality will be
checked and corrected.
SAT: It will be conducted at End user's place.Here field to
system will be checked and corrected.
| Is This Answer Correct ? | 13 Yes | 0 No |
Post New Answer View All Answers
we want to control pump in let pressure and tank (for exp) our inlet line if water cam and pump will on and when our tank will full pump will off also if our inlet pressure low pump will off even tank not full.this pump i want to uses on our water supply line.
What is the difference between modbus,fieldbus & profibus
what is piezoelectric transducer?give an example in power plant n state its principle?
what is cold loop? difference between hot and cold loop?
How can a d.p. Transmitter be calibrated?
what is the working principal of pribe
What is the differerence between hysterisis and linearity.
What are the application of bernoulli’s theorem?
What are the type of bonnets in the control valves?
what does the ratio 800-400-300-200/1-1-1-1-1 in the specification of current transformer indicates?
how to calibrate steam control valve in steam turbine
I have completed B.E. Instrumentation & control in 2009. i have 3 year industrial job experience in chemical plant.now, I want to join M.E. in external. so, Plese say easiet way and good institute name.
How to Calibrate Interface Level Troll in field
hi friends,im an instrumentation and contol engg student,can u hlp me of suggsting barc written question paper,my id is roysuvaranjan@gmail.com, cel no.9563591747
Displace type LT to be calibrated in workshop, wt. 40, dia- 60 mm, density- 0.8kg/cm3.