Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Tell me the STO Process ?

Answer Posted / jameer1980

STO movements takes place in 2 types of steps.

1. One step procedure.
2. Two step procedure.

First we need to extend the material master to the
receiving plant/storage location.In all the procedures
below mentioned by going to mm01 then mention the material
that we want to enter in the copy from,then extend the
material.


Scenario 1 (STO between 2 storage locations btwn same plant)
1. One step procedure.

In one step procedure stock removal from storage
location1 of plant1 and stock replishment in storage
location2 takes place simutaneously with movement type(301).
by going to MB1b (t.code).In that specify the supplying
plant/storage location and the receiving plant/storage
location.And enter the material that u want to transfer.

Note: Stock transfer btwn 2 storage locations with same
plant happens if they are having the same proximaty.

2. Two step procedure.

This step is used if the storage locations of the
plants are at some distance.
In this step first ,go to MBIB T.CODE then mentioned the
supplying plant/storage location and then enter the
material with quantity to be transfered with movement type
(303)the stock will be removed from the storage location.
Then again go to MBIB t.code then mention the movement type
(305) then mention the supplying plant/storage location and
then mention the receiving plant/storage location,then
enter quantity of the stock to be received.

The same procedure will be applicable to the 2 plants of
the same company code.It depends upon the type of step that
the business requires.If the plant to plant it is always
advisory to use the 2 step procedure.

Is This Answer Correct ?    3 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Name at least five features that you can control for the schedule line category? Relevance for delivery, availability check, transfer of requirements, goods movement, purchasing and incompletion log.

1121


Where in the sale order would you enter the serial numbers for material?

1154


What is handling unit in sap?

1224


client wants to have sales of particular material area wise. How to write functional spec for this

2525


What are the steps to create new tax category?

1983


Define credit control area (t014)?

1162


What is the procedure to handle reservation process in sap SD?

2677


Name the three internal organizational elements within a sales organization and briefly explain their function.

1278


Mention what are the two places where you need to configure cin (country version india)?

1194


How to change chart of accounts of company code after making several sales orders and delivery?

2140


Explain about distribution channel?

1147


What is a condition type? What are the two main groups of condition types?

1203


what is the role of sap sd fuational consultant in IDoc prepairtion,explan the IDoc process ( my email id umerimran12@gmail.com.)Plz help sd gurus

4293


what is solution database and how to intigrate the service order with solution database? what is purpose of t.code IS31? wht is the service manager? waiting for feedback

2135


what is consignment stock process?

1227