Answer Posted / ganesh varma
SAP stands for system application product in data processing
R/3 stands for 3-Tier Architecture.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
How to check cpu usage in EP?
How can I restrict the user from printing?
1)Have you used performance tuning? What major steps will you use for these? 2)In production what is the user exit? 3)What type of user exits have you written? 4)Difference between Search Helps and Match Codes 5)On which even we can validate the input fields in module progams? 6)what are the table controls in BDC ? 7)what is the difference between bdc and lsmw ? 8) If the scripts are client dependent, what above driver program ? (client dependent / independent) 9). I have two pages, In one page I want address, Header, Main & footer. In the second page I want only Main. How to do it? 10) Will 50,000 records be uploaded directly into APP's Server? 11) What is the button to change the variant in ALV ? 12) If your project is support project ? when is your implementation has completed ? 13)In start of selection, if we perform validation, what happens ? 12)How to join 3 tallies & looping. We have developed a program in a client say (200- client) and 210 has test data. No developing rights. How to test data? 13)How to transfer data which is coming from are report as output to another report 14)How to create standard text and how do u transfer it ? 15)What are the views when we are creating Material ?
How you can restrict multiple logins of user in sap? What are the thing you have to take care of while writing the id’s?
Where can you find a list of object keys included in a transport?
What is the information derived from OSS notes?
What is the importance of table t000?
What is the procedure to applying patches?
Does any one have SAP basis B1 Resume format for 4 to 5 year experience? if any one have please send me on kishorekharche@gmail.com
Why can't we do it thru some other client?
Hi, Cansomeone please send the system refresh doc , it's very urgent for me. Thanks in advance.
How you will give new authorizations?
If job is slow?
suppose in the landscape there is development, quality, pre-production and production system is there. what is the route(transport route) between pre-production to production? and why?
What is your organization’s security philosophy? What level of security does your data require? How much risk are you willing to assume in each application area?