how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?
Answer Posted / sjtbehera
In the case M30 concrete we calculating by design mix.but
incase of norminal mix we can use 1:1:2.
calculating cement, sand and concrete.
toal ratio=1+1+2=4
cement = 15.4/4=3.85cum=11bags
sand=3.85*1=3.85 cum
chips=3.85*2=7.7 cum
Notes: why we divided 15.4
but it is difficult to acess exactly the amount of each
material recquired to produce 1cum.of wet concrete when
deposite in place.
to find out volumes of cement sand & coarse aggregate
divided a numerical no. 15.4 variable up to 15.7 according
to proportioning and water cement ratio by the summation of
the proporation of the ingrediants used and then multiply
the result thus obtained their respective srength of
proportion.
| Is This Answer Correct ? | 156 Yes | 216 No |
Post New Answer View All Answers
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
What is chemical composion test
which method is used in semi-rigid connection design??
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
how much shouid be the rate for ready mix concrete per cubic meter
what is the use in canals of longitudinal drains and cross drains in lining areas?
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
What is alternate bid?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
What are the methods of measurement? Describe it shortly
How did street originate in the plumbing term street ell?
Why the finite element method is lower bound solution?
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?