why field winding is placed on rotor winding not on stator
winding in case of synchronous machine?
Answer Posted / berti
In the case of a synchronous machine, large a.c currents
are to be taken from the armature windings, so the armature
is the stator. It is better to make the armature the
stator, if large currents are to be taken from it.
| Is This Answer Correct ? | 23 Yes | 4 No |
Post New Answer View All Answers
Can any one provide the inspection procedure of MIMIC for VFD panel? Details: If someone wants to have a mimic in the VFD panel what are inputs considered for the mimic(like on,off,trip) whether we are able to add speed variation in the mimic(if so how can we get) and what are the parameters to be checked in the MIMIC during inspection?
Hi, This is Laila. I am selected for syndicate bank interview. Could you please share your views and the questions asked if you have faced the interview My email id is laila_honey09@yahoo.com Please send as fast as u can.Thank You Thanks... Laila.
how electrical earthing maintenance done in industry?
what will be happen if earth point is being used for as a neutral point for raw power , and same will be used for ups earthing
What are the parameters of water ( Water quality )to be monitored in Centralised HVAC ( water cooler chillers )
Earth leakage relay basic knowledge principle
pls tel me the electric train traction motors name plate details like rpm,torue,voltage,amps,watts..ect..
The height to which the liquid in a tank to be maintained for a certain constant velocity?
how is the incoming cable size calculated for a given current rating of a panel??
any body,pls tell me how to done relay coordination ? how to coordinate by TCC curve?how to read the tcc curve?
what is the solution for meger test failed the MV cable?
what are the advantages disadvantages of connecting high voltage block( 1:1 transformers) transformers between the turbo generators and busbars.
how you taken aotitude test
at meter room 50 hrc switch installed,but there are not get earthing proper,so what happen?and 11kv transformer out put going in to hrc main 400a three nog each? so earthing is require for all switch? (some customer made earthing at there home.)
Why power genaration in India is at 50HZ while America its 60HZ